28.5.497 — 20 November 2026

New

  • You can now set an Idle Time Unit of Measure on the cost center. When set, idle time lines generated for that cost center are posted under this unit instead of the unit of measure of the operation that was running.

28.5.492 — 18 November 2026

Fixed

  • When an idle time registration splits a production entry into several segments, each segment's Machine Counter Begin and Machine Counter End now reflect only its own share of the machine counter range, in proportion to its quantity. Previously, a split-off segment could repeat the full counter range of the original registration, or show 0/0.

28.5.485 — 16 November 2026

Improved

  • The Current Speed on the electronic job ticket is now averaged over a configurable window instead of a single message, so it no longer jumps between readings. Set the new Speed Averaging Window (sec) field on the cost center; it defaults to 30 seconds, existing cost centers are switched on automatically.

Fixed

  • A counter message that arrives out of order no longer moves the current speed backward or wrongly marks the machine as stopped.

28.5.475 — 12 November 2026

Fixed

  • Idle time is no longer registered while a makeready operation is running on the cost center; standing still for setup work (for example changing plates, ink or register) now counts as makeready time instead of idle time.

28.5.471 — 9 November 2026

Fixed

  • A production segment shorter than about 18 seconds, between two downtimes, no longer loses its quantity. Its quantity is now added to the next production segment, or to the previous one when there is no next segment.

28.5.380 — 5 November 2026

New

  • The PrintVis Job Costing Worksheet now shows, for each line, the description of the reason code, the machine section and its name, and the idle type with its description. This lets the production leader see which lines are downtime and why, before posting the consumption journal.

Fixed

  • Idle segments on the shop floor journal no longer get an incorrect Extra Used Hours split; a timing defect could record part of the idle time as regular time or show a small negative value instead of the actual idle duration. Hours are now also rounded to two decimals.
  • After an automatic switch to production, the stop time of the setup entry that is kept now reliably shows the operator's own clock time; the previous correction depended on a Business Central user lookup that did not match the operator and so did not always apply.
  • The green active bar on the electronic job ticket now follows the unit that is actually running after an automatic switch to production; it previously could stay on the setup tile.

28.5.302 — 30 October 2026

Fixed

  • Idle segments posted to the shop floor journal no longer lose their idle type, reason code and section code; a lookup defect caused this information to be dropped from every idle segment, posting it as if no reason had been given.
  • The setup time that is running when a job automatically switches to production is no longer deleted; it is now stopped and kept, so this time and the quantity registered during it are no longer missing from job costing.
  • The stop time recorded for that setup entry now shows the operator's local time instead of UTC, when the automatic switch runs in the background.

28.5.299 — 28 October 2026

Fixed

  • The Complete entries now notification action for unaccounted idle time now always opens the idle time registration(s) that actually caused the notification; it could previously open an empty list.
  • The automatic switch to production now really waits for the Speed Duration Threshold (sec) before switching; previously it could switch to production after a single event at production speed, even with a threshold of several minutes.

28.5.294 — 27 October 2026

Fixed

  • Idle time segmentation now also applies to shop floor entries that PrintVis has moved to the approval journal (when Shop Floor Posting is Move Worksheet for Approval), not only to entries completed directly on the shop floor.
  • The idle time reason, idle type and section code applied to a segment could in rare cases be taken from a different job's idle time registration if it had the same unit of measure and a matching time window; segmentation is now scoped to the correct job.
  • Resuming a paused shop floor entry on the same job no longer resets the Production Started time, so progress already made toward the automatic switch to production is preserved. Previously only a genuinely new job should reset it.
  • Journal entries created when the automatic switch to production starts a new job no longer record the start time in UTC; it is now corrected to the operator's time zone.

28.5.285 — 27 October 2026

New

  • Auto-Create CIM Controller/Device: a new setup switch that automatically creates and links a PrintVis CIM Controller and CIM Device the first time an unrecognized controller or device reports data through the Moxa or ifm moneo adapter.
  • Create/Link CIM Controller & Device action on the IoT Device list: re-parses the most recently received message for a device and creates or links its CIM Controller and CIM Device, regardless of the Auto-Create CIM Controller/Device setting.
  • A Linked CIM Device field on the IoT Device list shows the CIM Device Code most recently resolved for that device.

Improved

  • The routing of signals for the Moxa and ifm moneo adapters no longer depends on fields in IoT Link; each adapter now supplies its own routing match field.

Fixed

  • The Comment field on the Idle Time Registration page can now be typed directly; you no longer need the assist-edit pop-up.

28.5.264 — 17 October 2026

New

  • IoT Quantity Registration: assign a quantity registration mode (Register, Discard, Zero, Keep in Totals or Carry to Next Production) per unit of measure, extra work code or work code button, to control what happens with a quantity that a DCM device counted automatically. The applied mode and any suppressed quantity are visible on Labor Entries and the Shop Floor Journal List.
  • The license is counted per physical IoT device. Business Central regularly removes device status lines of CIM devices that no longer exist, so renumbered controllers, devices or channels do not inflate the license count.
  • A new action, Copy IoT Device Type & Controller Adapter setting to all selected, copies the IoT Device Type and Controller Adapter setting from one IoT device to multiple selected devices at once.

Improved

  • Clearer tooltips on the Idle Time Registration page and the Device Status field that describe what each field means instead of repeating its name.
  • The notification for unaccounted idle time now points to every registration that is missing a comment, idle type or extra work code, not only the first one found.

Fixed

  • Corrected the caption Speed Duration Threshold (sec) on the cost center (previously misspelled "Speed Duraction Threshold").
  • Fixed a crash that could occur when Business Central found no matching idle type reason while validating an idle time registration.
  • Selecting a Section Code or Idle Type without a matching reason no longer shows a "cannot be found in the related table" error; the Idle Type and Extra Work Code are cleared instead.

28.3.240 — 26 August 2026

New

  • A Description field on the IoT PV Controller.

Fixed

  • A workaround for the situation where the automatic approval of the CIM bypassed Shop Floor Posting.

28.3.231 — 4 August 2026

Improved

  • The upgrade sets Counter Channel 2, 3 and 4 to -1 on existing CIM devices.

28.3.200 — 23 June 2026

New

  • Double lane production: a CIM device can now have multiple counter channels.

28.3.188 — 14 June 2026

Improved

  • Filtered lookups for the idle time registration fields.

28.3.184 — 13 June 2026

Fixed

  • A guard for a plan unit that is not initialized.

28.3.181 — 5 June 2026

Improved

  • The filters and field names of the idle time registration are reworked.

28.3.179 — 2 June 2026

Improved

  • Idle type reasons now have a description field.

28.3.175 — 29 May 2026

New

  • You can choose per counter whether it is used for production or for consumption.

28.2.165 — 25 May 2026

New

  • Section code support for idle time management.

Improved

  • An additional requirement for the automatic switch to production.
  • Improved permission checks and unit conversion in the shop floor logic.

28.2.138 — 16 May 2026

Fixed

  • Missing information on the idle time registration.
  • The setup time kept running next to the production time after the automatic switch to production.
  • An archived job could not be changed after you entered comments.

28.1.0 — 29 April 2026

New

  • Enhanced idle time registration with mandatory classification and reason codes.
  • Automatic switch to production based on the machine speed.

28.0.0 — 23 April 2026

Improved

  • Updated for Business Central version 28.